Skip to main content

Santa Filomena Mining Unit · Sancos, Ayacucho

Minera SOTRAMI · Mining with a human face

We are a gold mining company with 39 years of continuous operation in Sancos, Ayacucho, founded in 1987 as a miners' workers society.

We integrate underground mining, formal sourcing from small-scale producers, and our own processing plant to export certified gold to Switzerland.

History and approach
Location
Ayacucho
Sancos District, Lucanas Province.
Altitude
2,450 m a.s.l.
Santa Filomena Mining Unit, with its own plant 10 km from the mine.

Certified ethical gold

From Sancos to Switzerland, fully traceable

We sell directly to accredited Swiss refineries (Argor-Heraeus and Valcambi), which supply responsible jewellery and watchmaking across Europe.

  • RJC
  • ICMI
  • FAIRTRADE
  • SBGA
  • MINAM ★
Learn more
SOTRAMI workers gathered in a circle at sunrise at the processing plant
SOTRAMI team in protective gear in front of the company emblem

SOTRAMI team at the mining unit

Mining with a human face

We are 167 partners, 607 direct employees, and more than 1,000 miners working with due diligence, ore traceability, and zero child labour.

Meet us

Production chain

We process ore through five integrated stages, from the mine to the doré bar:

01 / 05

  1. Drilling rig and SOTRAMI workers on the surface

    Stage 01

    Underground Mining & REINFO Sourcing

    See more
  2. Crushing and grinding area: ball mill and conveyor belts on blue structures with yellow railings (illustrative image) Illustrative image

    Stage 02

    Assaying, Crushing & Wet Grinding

    See more
  3. Agitated leaching tank battery at the Santa Filomena II Plant

    Stage 03

    Tank Leaching & Low-Grade PAD

    See more
  4. Desorption columns and electrowinning cells at the processing plant (illustrative image) Illustrative image

    Stage 04

    Desorption & Electrowinning

    See more
  5. Operator in heat-protective gear pouring molten doré into an ingot mold (illustrative image) Illustrative image

    Stage 05

    Doré Smelting & Swiss Export

    See more

Fine gold produced · 2023

1,283.22kg Au

92% exported as certified ethical gold · 94.06% metallurgical recovery

★ Awarded

First star, Peru Carbon Footprint (MINAM)

● Certified

International Cyanide Management Code (ICMI)

View sustainability

Latest news

View all news